Then begin nailing the shingles to the roof working in rows and starting at the edge of the roof.
How do you put asphalt shingles on a roof.
Every 5 inches make a new mark until you get to the rop of the roof.
Secure the horizontal flange to the roof.
Repeat this on both sides of the roof.
Place the second step flashing piece over the end shingle in the first course by positioning it 143 mm 5 5 8 above the bottom edge of the exposed asphalt shingle.
Install the shingles so that each one is overlapping the shingle directly below it which will conceal the nails.
Use the chalk line to snap a straight line vertically every 6 inches.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Make sure that the tab of the shingle in the second course will cover it completely.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.