2 the process of felting a shed roof.
How much should roofing felt overlap.
Adjacent pieces of drip edge should overlap at least 2 inches 51 mm.
Add new felt layers.
Have a helper ready to assist with this step and take care to get the lines straight and clean.
The drip edge should extend at least 2 inches on the roof.
Nail along the top of this strip at 500mm.
After this lines should be snapped every 34 as you move up the roof.
Do the other side of the roof the same way also with an overlap at the peak.
Clean and prepare the roof.
Understanding the benefits of each will help you decide which method to use for your roof.
Roofing felt is required to overlap 2 inches over the lower felt course.
When laying the metal panels on the roof the overlap ridge of the new panel should straddle the underlap ridge of the panel before it.
Buy the roof felt.
Work up the roof to the peak and fold felt over the top overlapping at least 3 inches and fasten it on both sides.
Position this strip so that it overhangs the top of the first sheet by 75mm.
The bottom course of felt on a roof called sarking felt ensures that all of the rainwater is correctly channeled into the gutter by protecting the eaves from any wind driven rain.
The last layer should go over both sides of the roof overlapping both side covered in felt.
The roofing felt should be applied in layers that overlap.
Must be installed at the rakes and eaves of the roof.
For an apex roof start at the bottom and lay it horizontal the next should overlap as in video so the water runs over the join as it runs off the roof finishing at the apex or top of roof.
Tack and secure the felt.
As the heat can partially melt the felt paper and the underside.
Trapped behind the guttering or if it is badly weathered it needs to be replaced.
Take your second length of felt.
If this felt is either incorrectly situated i e.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
Using a downwards brushing motion firmly press the top layer of roofing felt onto the adhesive taking care to.
Metal sealing and fastening apply side lap sealant if the pitch of your roof is 2 12 or less.
Chalk lines should be snapped 33 5 8 above the eave line.
1 what you will need when felting a shed roof.
The short overlap of the four inch offset is somewhat easier allowing you to use cutouts to overlap every two courses making less work for you.
The vertical leg of the drip edge should be at least 1 5 inches wide and extend at least 0 25 inches below the sheathing.
Roll out the first layer of felt.