This row should project half an inch 1 27 centimeters over the eaves.
How to align roof shingles.
Lay one row of shingles starting from the lower left corner of the roof.
Tips on how to install shingles on a straight gable roof.
Once you ve reached the ridge bend the shingle over the ridge so that each side is equal and nail it into place with a single nail on each side.
To attach a 3 tab shingle align it with the layout line and drive nails 1 2 inch above the cutout slots including the half slots at each side.
Installing asphalt shingles on a basic gable roof is one of the most straight forward of all roofing projects.
If you align the shingle.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
Cut your last shingle on each row to size repeating all the way to the ridge.
At no place on your shingle roof should the shingles line up exactly with the shingles in the previous row.
Gaf mastering the roof chapter 11 this video demonstrates the proper installation technique for timberline shingles.
Install the next shingle approximately 2 3 past the seal strip of the first shingle.
Before we go further i want to make.
Drive a nail at one end first then drive the others.
Nail down the shingles as you go along.
If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle.
Your last shingle is an exposed shingle.
Butt a full shingle up against the cut shingle and nail into place.
Nail each side of the shingle to each side of the ridge just below the shingles self sealing strip.
Keep this up until you reach the other end of the peak.
Place the first shingle end flush to the edge of the roof.
See below for a shopping list tools and steps subscr.
This 1 2 tab has to be cut off where it hangs off the left edge of the gable roof.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
Nail the starter strip with 1 1 4 galvanized roofing nails in a line 1 1 2 to 3 from the drip edge.
Align the starter shingle so that 3 4 sticks past the drip edge.